PT.INDONESIAN SERVICE BUREAU
Subsea Pipeline,Pipeline End Manifold,Single Point Mooring, Floating Storage Offloading Installation Engineering For Petrochina International Jabung Ltd

Subsea Pipeline,Pipeline End Manifold,Single Point Mooring, Floating Storage Offloading Installation Engineering For Petrochina International Jabung Ltd

PROJECT DESCRIPTION Relocation of Crude Oil Offloading Facilities of approximately 1.5 Kilometers further into deeper water depth. SCOPE OF WORK ISB Scope of Work for this project including : FEED Studies & complete installation engineering detail design of new Subsea Pipelines, new PLEM (from existing SPM PLEM to new SPM PLEM),SPM Installation,new FSO installation. Mooring analysis, 3D Time Domain, Random Wave analysis, in accordance with ABS and DNV’s Limit state requirements of the new Crude Oil Offloading facilities. More info for this project * indicates required field Name:* Email:* Phone* Company* Subject:* Message:* CAPTCHA...
FEED & Detail Engineering for Condensate and LPG process platform for Petrochina International Jabung Ltd’s Betara Complex Development (BCD)

FEED & Detail Engineering for Condensate and LPG process platform for Petrochina International Jabung Ltd’s Betara Complex Development (BCD)

PROJECT DESCRIPTION: In Betara Complex Development (BCD) Project, five additional on-shore fields will be developed and the refined products gas and condensate will be exported via offshore terminal. The project includes gathering lines, refining and fractionating units, onshore trunk lines, horizontal drilling at shore approach, submarine pipelines and two (2) marine offloading terminals. The EPCI contractors were Chiyoda and SembCorp. Chiyoda’s scope of work was the building of the refinery whilst SembCorp undertook all the pipelines and the offshore facilities. Year :    2004 SCOPE OF WORK: ISB Scope of Work for this project covered complete offshore facilities including: Detail Engineering for Construction of two loading terminals for Condensate & LPG process platform Detail Engineering of 3 submarine pipelines Detail Engineering Design of dolphin, Anchor Piles and offloading system FEED Studies of new Subsea Pipeline, new PLEM, and mooring analysis of the new Crude Oil Offloading facilities. 3D Time Domain, Random Wave analysis for the mooring system, in accordance with ABS and DNV’s Limit state requirements FSO Mooring Detail Engineering Design& Analysis FSO Model Testing Assisting in fabrication, vendor selection Assisting in certification by third party More info for this project * indicates required field Name:* Email:* Phone* Company* Subject:* Message:* CAPTCHA...
Blanket Engineering Service (Front End Study & Detail Engineering) for STAR ENERGY’s Oil Platforms

Blanket Engineering Service (Front End Study & Detail Engineering) for STAR ENERGY’s Oil Platforms

PROJECT DESCRIPTION: Star Energy (Kakap) Ltd. (Company) Currently is producing oil from four platforms KH, KF, KG and KRA and five sub sea wells. Oil is produced and shipped to the Kakap Natuna FPSO for storage and export via tankers.The Kakap Gas Compression facility which consist of gas gathering, treatment and compression facilities on the existing KH, KRA and KF Platforms through two infield pipelines to export gas to Singapore via the WNTS pipeline is in operation since 2001.Further development of the Kakap field are as follows : tie in of KG gas fields into the system, providing KF Gas Booster System for lowering suction pressure of incoming gas supply, production system evaluation, process plant optimization, improvement facility/ modifications to existing facilities for increasing facilities reliability & integrity, and facilities for Water Injection Application in KF Field. Date:    2009-2011 SCOPE OF WORK: ISB Scope of Work for this project includes Front End Engineering Design & Detail Engineering of : Gas Production Facilities Oil Production Facilities Facility Modification / Preparation For Interfacing With Future Field Development Projects Utility System & Other Facilities Upgrade More info for this project * indicates required field Name:* Email:* Phone* Company* Subject:* Message:* CAPTCHA...
Front End Engineering Studies of South Sumatra Natural Gas Liquids/NGL for PT.PERTAGAS

Front End Engineering Studies of South Sumatra Natural Gas Liquids/NGL for PT.PERTAGAS

PROJECT DESCRIPTION E1 and Pertagas, a subsidiary of Pertamina, propose to build, own and operate a NGL Plant in South Sumatra, Indonesia.  The NGL will be extracted from natural gas which Pertagas presently supplies to users in the Palembang area.  After extraction the NGL will be processed.  The lean natural gas will be returned to Pertagas. An extraction plant is proposed for Prabumilih Barat in South Sumatra and a plant for processing the NGL at Sungai Gerong, within the Pertamina refinery complex, at Palembang. SCOPE OF WORK ISB Scope of Work for this project includes : Review of process flow scheme & agree final scheme with client Check proposed sites for the facilities in Prabumulih Barat and Sungai Gerong and prepare draft plot plans for inclusion in the ITB Check and advise on the suitability of existing Pertamina pipeline Right of Way (ROW) to accommodate the NGL pipeline Propose potential pipeline route from the termination point of the Pertamina ROW to the proposed site for the fractionation and storage facilities in Sungai Gerong Prepare scope of any required soil investigation work Review and advise on logistics with respect to delivery of large equipment to the Prabumulih Barat site Prepare an Invitation to Bid (ITB) for EPC bidders including form of contract, guarantee requirements, proposed schedules, codes & standards, etc. The ITB will include information to EPC bidders on the following: Location & Civil Electrical, Instrumentation & Control Mechanical Machinery Process Design Inspection (incl. QA & QC) Health, Safety & Environment Form of Contract Provide Capital Cost Estimate for the facilities Assist with responding to EPC bidder queries during bid...
Protected by تحميل برنامج