FEED & Detail Engineering for Condensate and LPG process platform for Petrochina International Jabung Ltd’s Betara Complex Development (BCD)

FEED & Detail Engineering for Condensate and LPG process platform for Petrochina International Jabung Ltd’s Betara Complex Development (BCD)

PROJECT DESCRIPTION: In Betara Complex Development (BCD) Project, five additional on-shore fields will be developed and the refined products gas and condensate will be exported via offshore terminal. The project includes gathering lines, refining and fractionating units, onshore trunk lines, horizontal drilling at shore approach, submarine pipelines and two (2) marine offloading terminals. The EPCI contractors were Chiyoda and SembCorp. Chiyoda’s scope of work was the building of the refinery whilst SembCorp undertook all the pipelines and the offshore facilities. Year :    2004 SCOPE OF WORK: ISB Scope of Work for this project covered complete offshore facilities including: Detail Engineering for Construction of two loading terminals for Condensate & LPG process platform Detail Engineering of 3 submarine pipelines Detail Engineering Design of dolphin, Anchor Piles and offloading system FEED Studies of new Subsea Pipeline, new PLEM, and mooring analysis of the new Crude Oil Offloading facilities. 3D Time Domain, Random Wave analysis for the mooring system, in accordance with ABS and DNV’s Limit state requirements FSO Mooring Detail Engineering Design& Analysis FSO Model Testing Assisting in fabrication, vendor selection Assisting in certification by third party More info for this project * indicates required field Name:* Email:* Phone* Company* Subject:* Message:* CAPTCHA...
Heera Redevelopment Project for ONGC (India)

Heera Redevelopment Project for ONGC (India)

PROJECT DESCRIPTION: The project involves four new wellhead platforms; HI, HJ, HSC and B-134. Modification to 6 existing platforms; HC, HV, HF, HSA, HRG & HRC. It also includes 8 rigid subsea pipeline, 3 flexilines, umbilicals and cables. SCOPE OF WORK: ISB completed Conceptual Studies,Detail Engineering Design,Procurement Assistance and Installation Engineering of : 4 (Four) new Wellhead Platforms Modifications of 6 (Six) Existing Platforms 8 (Eight) Rigid Subsea Pipeline 3 (Three) Flexilines, Umbilicals and Cables The Pipeline Design and Installation Engineering include : 8 Nos Submarine Rigid Pipelines Engineering design 8 Nos Submarine Rigid Pipelines Installation 3 Nos Submarine Flexible Pipelines Installation 3 Nos Submarine Composite Cable Installation Submarine Rigid Pipelines Lifting for Crossing Installation Flexible Pipe and Composite Cable Lifting for Crossing Installation More info for this project * indicates required field Name:* Email:* Phone* Company* Subject:* Message:* CAPTCHA...
Blanket Engineering Service (Front End Study & Detail Engineering) for STAR ENERGY’s Oil Platforms

Blanket Engineering Service (Front End Study & Detail Engineering) for STAR ENERGY’s Oil Platforms

PROJECT DESCRIPTION: Star Energy (Kakap) Ltd. (Company) Currently is producing oil from four platforms KH, KF, KG and KRA and five sub sea wells. Oil is produced and shipped to the Kakap Natuna FPSO for storage and export via tankers.The Kakap Gas Compression facility which consist of gas gathering, treatment and compression facilities on the existing KH, KRA and KF Platforms through two infield pipelines to export gas to Singapore via the WNTS pipeline is in operation since 2001.Further development of the Kakap field are as follows : tie in of KG gas fields into the system, providing KF Gas Booster System for lowering suction pressure of incoming gas supply, production system evaluation, process plant optimization, improvement facility/ modifications to existing facilities for increasing facilities reliability & integrity, and facilities for Water Injection Application in KF Field. Date:    2009-2011 SCOPE OF WORK: ISB Scope of Work for this project includes Front End Engineering Design & Detail Engineering of : Gas Production Facilities Oil Production Facilities Facility Modification / Preparation For Interfacing With Future Field Development Projects Utility System & Other Facilities Upgrade More info for this project * indicates required field Name:* Email:* Phone* Company* Subject:* Message:* CAPTCHA...
Installation Engineering of Condensate Stripper Overhead Compressor,Membrane,Memguard-Molesieve Tower and EMS Packages for PETROCHINA’s Betara Gas Plant

Installation Engineering of Condensate Stripper Overhead Compressor,Membrane,Memguard-Molesieve Tower and EMS Packages for PETROCHINA’s Betara Gas Plant

PROJECT DESCRIPTION: The original Betara Complex Development(BCD) design for Betara Gas Plant (BGP) Condensate Stripper Compression was for 2×100% Overhead Compressors 605-K-1 01A/B, to handle a gas quantity of approx. 12 MMSCFD. Approximately 4-6 MMSCFD of additional gas is flowing to Compressors 605-K-1 01A/B. This caused the operating configuration to be changed from 2×1 00% duty/standby to 2×50% units to accommodate the additional gas, with no spare compressor available. A compressor trip could cause a loss in processing of 4-6 MMSCFD of raw gas. SCOPE OF WORK: ISB Scope of Work for this project are Multi-discipline Detail Engineering as well as Project Management Services for Installation of Condensate Stripper Overhead Compressor,Membrane,Memguard-Molesieve Tower and EMS Packages at Betara Gas Plant Field. This is to ensure availability of compression if either of the operating compressors is down for maintenance, and to mitigate risk of compressor trip. More info for this project * indicates required field Name:* Email:* Phone* Company* Subject:* Message:* CAPTCHA...
Project Management Consultant/PMC for Arun LNG Receiving HUB & Regasification Terminal for PT.PERTAMINA

Project Management Consultant/PMC for Arun LNG Receiving HUB & Regasification Terminal for PT.PERTAMINA

PROJECT DESCRIPTION PT.PERTAMINA intended to construct new equipments and upgrade the existing Arun LNG facilities for LNG Receiving Hub and Regasification Terminal with maximizing utilization of exiting Arun LNG plant facilities. SCOPE OF WORK ISB Scope of Work for this project includes : Review EPC bid, assist in Pre-Bid, Technical Bid Evaluation including Commercial proposed by Bidders Project Management, Coordination and Administration of all project activity Contract Administration pertaining to Contractor activities Review/evaluation and Confirmation of Contractor/vendor works and products Project Implementation & Master Schedules Periodic Reporting/Auditing Review of Contractors Engineering Documents Overall Management and Coordination of the construction supervision team Supervision of construction workmanship Review/assist PT PERTAMINA in Pre-commissioning and Commissioning Activities Review/assist PT PERTAMINA in Start-up Operation More info for this project * indicates required field Name:* Email:* Phone* Company* Subject:* Message:* CAPTCHA...