PROJECT DESCRIPTION

As part of the oil and gas reserves development plan, the construction of Subsea 6 (six) inches Gas Lift Pipeline Replacement Project will transport Gas Lift from Central Processing Platform/CPP then flow through Wellhead Platform/WHP-B to be injected to oil wells on WHP-A approximately 9 km via 6 inches subsea pipeline.

The Ujung Pangkah fields are currently produced via the WHP-A, WHP-B and CPP / AUP which contains the wellheads and provides the processing facilities.

SCOPE OF WORK

ISB Scope of Work for this project includes :

  • Pipelines & Risers Detail Engineering Design
  • Load-out, Sea-fastening Engineering
  • Transportation Engineering