PROJECT DESCRIPTION:

The project involves four new wellhead platforms; HI, HJ, HSC and B-134. Modification to 6 existing platforms; HC, HV, HF, HSA, HRG & HRC. It also includes 8 rigid subsea pipeline, 3 flexilines, umbilicals and cables.

SCOPE OF WORK:

ISB completed Conceptual Studies,Detail Engineering Design,Procurement Assistance and Installation Engineering of :

  • 4 (Four) new Wellhead Platforms
  • Modifications of 6 (Six) Existing Platforms
  • 8 (Eight) Rigid Subsea Pipeline
  • 3 (Three) Flexilines, Umbilicals and Cables

The Pipeline Design and Installation Engineering include :

  • 8 Nos Submarine Rigid Pipelines Engineering design
  • 8 Nos Submarine Rigid Pipelines Installation
  • 3 Nos Submarine Flexible Pipelines Installation
  • 3 Nos Submarine Composite Cable Installation
  • Submarine Rigid Pipelines Lifting for Crossing Installation
  • Flexible Pipe and Composite Cable Lifting for Crossing Installation