PROJECT DESCRIPTION:

The Sengkang Power Plant, Stage 1 Open Cycle 85 MW and Stage 2 Combined Cycle 135 MW was developed to match the growth in demand for electricity in South Sulawesi. This is the equivalent of up to 50% of the current electricity generation needs and approximately 40% of future needs for the next 5 years. The availability of a clean, efficient and reliable source of electricity generation at Sengkang will support economic development and industrial growth in the Region and in South Sulawesi.

SCOPE OF WORK:

ISB Scope of Work for this project includes detail engineering for :

  • Fuel Gas Electric Heater
  • Ethane Electric Heater Package
  • Butane Electric Heater Package
  • Butane Make Up Electric Heater
  • Liquid Nitrogen Heater Package
  • Nitrogen Generation System
  • Warm & Cold Flare
  • Ethane and LIN Storage Tank
  • Instrument Air & Plant Air System
  • Fire Water Pumps
  • Firewater Service Water Tank