PROJECT DESCRIPTION:

As part of the oil and gas reserves development plan , the construction of Subsea 6″ Gas Lift Pipeline Replacement Project will transport Gas Lift from CPP then flow through WHP-B to be injected to oil wells on WHP-A approximately 9 km via 6″ subsea pipeline.

The Ujung Pangkah fields are currently produced via the WHP-A, WHP-B and CPP / AUP which contains the wellheads and provides the processing facilities.

Date:                Nov 2012 – April 2013

SCOPE OF WORK:

ISB Scope of Work for this project includes following :

  • Pipeline / Riser Detail Design
  • Load-out, Seafastening and Transportation Engineering
  • Pipeline installation and Riser Installation for the WHP-B and WHP-A